For Boats/ships
for your boat or yacht
Description
Epifanes Fast Drying Epoxy Primer
Description:
Fast-drying two-component protective primer. Even at lower temperatures
excellent adhesion to (hot-dip galvanized) steel and non-ferrous metals, polyester
and plywood. Highly filling and excellent anti-corrosion properties.
Can be painted over with one- and two-component paints and primers based on alkyd, urethane, chlorinated rubber and epoxy.
Packaging: 750ml. A+B ( A 600 ml + B 150 ml )
Mixing ratio A+B 4:1
Application:
Filling primer / bonding primer in one- and two-component systems indoors and outdoors, above and below the waterline.
Very suitable as a repair primer on various painted surfaces and for maintenance of existing epoxy systems.
Paintable:
With alkyd and urethane paints and primers Min. after 5 hours at 18°C. max. after 10 days at 18°C.
Spread rate:
10m² per liter @ 50 µm dry film thickness
Colours: Grey
Gloss: Semi-gloss
Density: 1.40 kg / dm³ ( mixed product )br/>
Viscosity at 20°C// 65% RH: 50 seconds DIN cup 6 mm
Solid content 50 ± 2 vol..% (mixed product)
VOC content 454 grams / liter (mixed product)
Packaging 750ml.
Shelf life At least 2 years from date of manufacture, if stored at a
temperature between 5° and 30° in unopened original packaging.
Mixing ratio:
Induction time at 20°C. / 65% RH 10-15 minutes
Pot life after mixing:
10°C. 12 hours
15°C. 10 o'clock
20°C. 8 hours
Processing conditions during: application and drying
Temperature at least 10°C minimum. - maximum 28°C.
Relative humidity minimum 50% - maximum 75%
The temperature of the substrate must be at least 3 degrees above the dew point.
Thinner brush Epifanes Thinner D-601
Thinner syringe Epifanes Thinner D-601
Thinning in general Add thinner after mixing both components.
Amount also depends on the temperature of the product and the environment.
Processing Brush - roller - spray.
Recommended layer thickness per coat 100 - 150 µm wet = 50 - 75 µm dry
Processing instructions Do not apply this product wet-on-wet and avoid higher layer thicknesses than
advised to prevent sagging and problems with through-drying.
Temperature of paint, object and environment should not differ too much
deviate.
Substrate conditions:
Completely free of rust, grease, dirt and other contaminants.
Remove salt and other water-soluble contamination by rinsing thoroughly
with clean water and a high-pressure hose or an emulsifier.
Remove grease and oil by cleaning with water and ammonia or another suitable cleaning agent.
Roughen with P 60-80
Paintability at 60 µm dry film thickness
Paintability: at 60 µm dry film thickness
With Epifanes Poly-urethane and epoxy paints and primer
Min. recoat time
At 10°C 16 hours
At 15°C 12 hours
At 20°C 8 hours
max. overcoating time: (not exposed to UV) 6 months 6 months 6 months
max. recoating time (when exposed to UV) 3 months 3 months 3 months
Min. recoatable time At 10°C. substrate temp. 10 hours
Min. recoatable time At 15°C. substrate temp. 8 o'clock
Min. recoatable time At 20°C. substrate temp. 5 hours
max. overcoating time At 10°C. substrate temp. 21 days
max. overcoating time At 15°C. substrate temp. 14 days
max. overcoating time At 20°C. substrate temp. 10 days
Epifanes Multicover Epoxy Primer
Versatile two-component Multicover Epoxy primer
Theoretical coverage 10m² per liter @ 50 µm dry film thickness
Practical yield The yield depends on the application method, conditions
during application, quality of the substrate and the shape of the object, etc.
Application details
Drying times at 50 µm dry film thickness
If a subsequent layer of Epoxy primer is applied within 5 days,
intermediate sanding is not necessary. After 5 days with grit P120
sand before applying a new coat.
Substrate conditions Completely free of rust, grease, dirt and other contaminants.
Remove salt and other water-soluble contamination by thoroughly rinsing
with clean water and a high-pressure hose or an emulsifier.
Remove grease and oil by cleaning with water and ammonia or another suitable cleaning agent.
Paintability:
Above the waterline with
Above and below the waterline with
After 24 hours at 20°C / 65% RH
Epifanes Poly-urethane Yacht Varnish - Epifanes Poly-urethane Primer
Epifanes Epoxy HB Coat - Epifanes Interim Coat
Filler Epifanes Epoxy Filler 1500 - Epifanes Epoxy Finishing Filler
Epifanes Epoxy Filler LG 880
Safety The user of this product must comply with national laws regarding g